
Add to Cart
ROVATE Two Handle Thermostatic Kitchen Faucets 360 Degree Rotation
Product Description:
Faucet Main Market: Europe, Asia, South America, Africa,Mid-East
Advantage: over 15 years experience on faucet producing
Sample Lead Time: 1-5 days
Form of sale: OEM & ODM Manufacture
Faucet Name: Thermostatic Sink Faucet
Meterial: Copper 59-60%, thermostatic faucet
Faucet Type: Thermostatic Sink Faucet
Certification: ISO9001:2000;CE&ROHS
Faucet Style: Kitchen Tap Faucet
Usage: Thermostatic Faucet Kitchen
Model Number: 648
Surface Finishing: Chrome
Feature: Thermostatic Faucets
Surface Treatment: Polished
Installation Type: Deck Mounted
Number of Handles: Dual Handle
Style: Contemporary
Valve Core Material: Ceramic
Number of Holes for Installation: Single Hole
Spray Type: Side
Product Name | Thermostatic Sink Faucet |
Material | Solid brass main body,Cu>=59% |
Work Pressure | 0.05Mpa—1Mpa |
Ideal Pressure | 0.1Mpa—0.5Mpa.Installation pressure release valve when exceed ideal pressure. |
Standard Pressure | Dynamic pressure0.3±0.02Mpa. |
Water Pressure Testing | 1.6MPA |
Air Pressure Testing | 0.6MPA |
Cold Water Supply Temperature | 4-29°C |
Hot Water Supply Temperature | 55-85°C |
Proposed Water Supply Temperature | 55-70°C |
Out Water Temperature Range | 20-55°C |
The Safety Temperature | 38°C |
Safety Characteristic | If cold water supply fails ,flow rate will be reduced to virtually shut off which avoid the risk of scalding. |
Temperature accuracy | Kept constant ±2°C for the setting. |
The Thickness Of Chrome Plating | Nickel>8um Chrome>0.2um |
Specification about Faucets | |||||||||
1. Zinc body and zinc alloy handle | |||||||||
2. Cartridge: 1/2" brass cartridge | |||||||||
3: Spout: Ø 18mm iron goose spout, zinc nut, ABS aerator | |||||||||
4. Accessaries: 1/2" 40CM aluminium braided hose , iron fitting chromed brass | |||||||||
5. Package : Cloth bag / bubble bag / Nylon bag | |||||||||
6. Box: White box /Color box, 20PCS/CTN |
Packaging Details
1) Inner Packing:cloth bag and bubble bag with color box
2) Outer Packing:20pcs per carton.
The package can be designed by customer's requirement
Port: Ningbo China
Lead Time : 25-30 Days After Deposit